Choose Your Province/State of Service

In order to serve you better, please select your Enbridge Gas location services.

Choose Your Province/State of Service

We noticed you are visiting from Utah, would you like to visit our Utah site?

Continue to Utah's site

Or please select your province/state of your choice so we can display the correct content for your location?

Choose Your Province/State of Service

In order to serve you better, please select your Enbridge Gas location services.

is currently
selected

Go to this state's site Stay on this state's site

Choose Your Province/State of Service

We noticed you are visiting from Utah, would you like to visit our Utah site?

is currently
selected

This non-binding expression of interest bid form is only for the Stratford-Palmerston-Goderich-Teeswater area non-binding expression of interest area of benefit. Bids for other areas of Ontario will not be accepted. Please refer to the map noted on this page for the specific area in question.

Please complete, sign and return this Non-Binding Expression of Interest Bid Form (“Bid Form”) on or before 12 p.m. EDT on Dec.17, 2024.

It is understood that Enbridge Gas will review and acknowledge all Bid Forms received on or before Dec. 18, 2024.

Please view this map to see the area where bids will be accepted in.

Existing customers: submit only one Bid Form for each distribution contract.

Existing customers or new customers: If this Bid Form is for a new property, or an existing property not covered by a distribution contract, submit only one Bid Form per property.

Bid Forms will be treated as confidential and only aggregated or non-identifiable data will be used to support any public submissions to the Ontario Energy Board (OEB).

Enbridge Gas in its sole discretion reserves the right to reject any bids received.

Should you have any questions on the form, please contact Economic.Development@Enbridge.com.

* Required field.

Fill out your property address. This is a required field. The property x, y and service address fields are optional.

Bid section

  • Please select one, or multiple, bid options of the three listed. This is a required field.
  • For all bid options: when inputting your bid, please put your bid m3/hr in the Incremental row in whatever years you would like your capacity in – the Cumulative row will then auto-populate when you do. This is a required field. Please do not enter anything in the cumulative row.
  • For all bid options: once you have finished inputting your bid, you will need to put your ‘total new firm/total conversion/total new interruptible gas needs over planning horizon’ in the row noted below. This would be the amount shown in the last column (2036) Cumulative. This is a required field.
  • If entering a ‘new firm’ bid: you will need to answer two yes/no questions. Based on what you select, options will appear to further answer the question with details. These are required fields.
  • If entering a ‘conversion of existing interruptible distribution service to firm distribution service’ bid: you will need to answer a question on the driving factors behind the request. This is a required field.
New firm natural gas needs. An increase of firm gas needs at the above location (i.e. new equipment, new processes), or a new firm gas load as a result of a new build.

Year

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

Incremental (m3/h)
Cumulative (m3/h)

Please provide responses to following questions if you have expressed interest in new firm natural gas needs in the table above.

Interruptible service as an alternative to new firm service:

Conversion of existing interruptible distribution service to firm distribution service. The amount of incremental firm distribution service needed net of any existing firm distribution service resulting from conversion of existing interruptible service to firm distribution service.

Year

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

Incremental (m3/h)
Cumulative (m3/h)
New interruptible natural gas needs. An increase of interruptible gas needs at the above location (i.e. new equipment, new processes), or a new interruptible gas load as a result of a new build where customer is willing to accept the terms and conditions of interruptible service (for example periodic curtailment of gas distribution service)

Year

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

Incremental (m3/h)
Cumulative (m3/h)

Next, fill out any conditions on your EOI bid you would like noted. This is an optional field.

Economic Development impacts related to incremental gas needs:

Next, in the ‘Economic development impacts related to incremental gas needs’ section, please fill out the sections with what your company knows in terms of what your bid amounts would mean for job creation and economic development. Note, this is an optional section but it is highly encouraged that you fill this out.

Number of net new jobs related to this expansion:

direct +

indirect =

total

Mandatory Demand Side Management (Conservation) Questions

These questions must be answered in order for your Non-Binding EOI or Non-Binding ROS (or both) Bid Forms to be accepted.

Note: Includes natural gas conservation activities within and outside of Enbridge Gas’ existing energy conservation programs and the use of non-natural gas alternative options.
If yes, an Enbridge Gas Energy Conservation Advisor will contact you following the close of the bid period to discuss in more detail.

Finally, please fill out all your company details, and press the submit button. These are all required fields.